Bond Latest
Updated Beaverton High School Renderings
As the rebuild project for Beaverton High School continues, here are some renderings of what the school could possibly look like in the future. The design team provided these sketches after getting feedback from students, staff and parents about the rebuild project
BSD held 19 sessions to hear what everyone had to say about the early designs of the high school. At this stage, the design team is determining where things should be located in the building and how the floor plan fits together.
Construction will start in 2024.