Opened September 2017 
Icon of money
$33,924,000 Budget
Icon of ruler and triangle to indicate size
87,200 sq. ft. 
Icon of students
750 Student Capacity 
A vibrant new library is shown at Vose Elementary School.
Vibrant furniture is stacked on top of each other at a new additional classroom space at Vose Elementary School.
Vibrant furniture is stacked on top of each other at a new additional classroom space at Vose Elementary School with natural

Students at Vose Elementary School will be enjoying four new classrooms along with a new vibrant and colorful library, thanks to the 2014 Bond.

The District worked throughout the summer to construct the additional classrooms, including a technology lab. Along with plenty of natural light, you’ll notice the additions integrate seamlessly with the existing building.

thin line

Construction Photos

Removal of tree
Removal of tree
Old school being prepared for demolition
Demolition of old school
Demolition of old school
Tree on construction site
Staff dig in dirt at groundbreaking
Students dig in dirt at groundbreaking
Students dig in dirt at groundbreaking
Steel framing of new school
Steel brace during construction
Steel framing of school
Construction of commons area
Commons area under construction
Courtyard under construction
Construction of commons area
Classroom under construction
Exterior paneling being installed on school
Front exterior of school
Owl mosaic on wall of school
Seating area in school
Students on playground
Students in classroom
Front exterior of school
School sign
thin blue line
classroom icon
32 Classrooms + 9 Additional Teaching Spaces 
natural light and fresh air icon
Natural Light & Fresh Air

Abundant natural light and constant fresh outside air to all classrooms

seismic icon new
Seismic Reinforcement 
security icon new
Enhanced Security 
thin blue line
central location icon
Large Venue for School & Community Events 

Centrally located gym, commons and courtyard

solar icon new
Solar Panels 

Generate 84 kW, 20% of what the building uses

parking icon new
140+ Parking Spaces
playground icon new
Safe Playgrounds 
thin blue line
accessibility icon
Accessible Wheelchair Ramps and Bathrooms 
hvac icon
State of the Art HVAC Systems 
dividable gym icon
Dividable Gym 
technology new icon
Learning Technology

The new Vose Elementary School opened its doors in September 2017. Vose students and staff spent the 2016-2017 school year in a temporary school in the Timberland area, while their school was demolished and rebuilt.

Vose was designed as a prototype school by DLR Group Architects. Sato, Hazeldale and William Walker Elementaries have the same design, part of a cost-saving measure by the District.

Vose has capacity for 750 students. The 87,200-square foot school includes 32 classrooms, nine additional teaching spaces, a stage, teaching area in the library and a dividable gym. The school was built by Triplett Wellman.

Visitors to the school may wonder what happened to the two giant sequoia trees that stood in front of the old building. Those trees were cut down to align the school's new main entrance drive to King Boulevard. The wood from the trees was repurposed and used for several artistic and functional items in the new school.

Time Lapse Video of Construction

Download Poster PDF
Download Poster Icon blue

Architect: DLR Group

Contractor: Triplett Wellman